Welcome to this website!
  • neye

2020 China New Design Electrical Isolation Tag - 10-Lock Padlock Station kit LG02 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our enterprise since its inception, often regards solution excellent as enterprise life, continually strengthen output technology, enhance product high quality and continually strengthen organization total high-quality administration, in strict accordance using the national standard ISO 9001:2000 for Lockout Tagout Bags , Lockout Tagout Lock Box , Electrical Lockout Tags , Honesty is our principle, skilled procedure is our perform, service is our target, and customers' satisfaction is our long term!
2020 China New Design Electrical Isolation Tag - 10-Lock Padlock Station kit LG02 – Lockey Detail:

10-Lock Padlock Station  LG02

a) Made from engineering plastic PC.

b) It’s one piece design, with a cover to lock out.

c) Each hanger clip accommodates 2 padlocks or lockout hasps.

d) Lockable –Can use a combination padlock to limit access to authorized employee.

e) Overall size: 565mm(W)×400mm(H)×65mm(D).

 

Including:

Lockout Station (LS02)×1;

Safety Padlock (P38S-RED)×10;

Lockout Hasp (SH01)×1;

Lockout Hasp (SH02)×1;

Lockout Tag (LT03)×24;

Some cable tie.

 LG02_01 LG02_02

 width=

Considerations for Loto applications

Lockout Tagout safety procedures must be established, and operations and procedures for shutting down machinery and equipment and controlling potentially hazardous energy sources are required when performing repair or maintenance activities.

Employees must be trained in Lockout tagout prior to operation.

Outsourcing suppliers must also be aware of your company’s LOTO program.

The outsourcing supplier must perform Loto Lockout Tagout and let your employees know when they need to perform maintenance work on your equipment.

The Loto Lockout Tagout facility must be removed by the person who placed it.

When the Loto Lockout Tagout facility is used on different shifts, it is important to communicate and handover.

Regular inspection

Is the person trained to perform the “locking” properly qualified

Whether the locks and locking auxiliary devices and signs meet the safety requirements and are properly managed, and whether the locks are used for personal use

Are there alternative security measures for debugging and other exceptions

Whether the communication in the actual implementation is sufficient, whether the measures are carried out in strict accordance with the procedures, and whether there are corresponding working procedures.

 

The “Energy Isolation Information Board” shall be erected on site — the designated storage place for equipment locks, the centralized locking point for employees, the obtaining of relevant written program documents, the obtaining of standby hangtags, the visual isolation point chart, the information of authorized employees on duty and the information of the procedures used shall be publicized.

Contents above: 1. Name and phone number of centralized caller 2. Total number of locks in isolation group 3. Table 4 of isolation points Centralized Locking Box 5. Isolation System 6. Activity Plan 7. Dangerous Tag Removal Box 8.


Product detail pictures:

2020 China New Design Electrical Isolation Tag - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

2020 China New Design Electrical Isolation Tag - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

2020 China New Design Electrical Isolation Tag - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

2020 China New Design Electrical Isolation Tag - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

2020 China New Design Electrical Isolation Tag - 10-Lock Padlock Station kit LG02 – Lockey detail pictures


Related Product Guide:
Unlicensed live operation accident
Safety overhaul -Lock out tag out

We also present product or service sourcing and flight consolidation products and services. We have our possess manufacturing facility and sourcing place of work. We can easily supply you with almost every type of product or service connected to our item variety for 2020 China New Design Electrical Isolation Tag - 10-Lock Padlock Station kit LG02 – Lockey , The product will supply to all over the world, such as: Swansea, Paraguay, Mauritius, We rely on high-quality materials, perfect design, excellent customer service and the competitive price to win the trust of many customers at home and abroad. 95%products are exported to overseas markets.
  • This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
    5 Stars By Fay from Adelaide - 2017.01.28 19:59
    We have been engaged in this industry for many years, we appreciate the work attitude and production capacity of the company, this is a reputable and professional manufacturer.
    5 Stars By Judy from Florida - 2018.03.03 13:09
    Write your message here and send it to us