Welcome to this website!
  • neye

China Factory for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag SLT01 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We can easily usually fulfill our respected customers with our very good top quality, very good price tag and excellent support due to we have been more expert and much more hard-working and do it in cost-effective way for Plug Lockout Cover , Pvc Lockout , Loto Lockout , We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
China Factory for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag SLT01 – Lockey Detail:

Plastic Safety Scaffolding Holder tag SLT01

a) The plastic scaffold tag holder is made from ABS, tag is made of PVC.

b) Provides system, procedural and legal compliance for scaffolds on work sites.

c) Provides a clear inspection trail giving integrity and control of work carried out.

d) The tags are avaliable in three durable write-on materials, providing highly visual and eye-catching information.

e) Each with a scaffold tag holder and a tag.The tags can be customized.

Part No. Description
SLT01 Size:310mm×92mm,Diameter:60mm
SLT02 Size:213mm×56mm
SLT03 Size: 81mm×39mm

SLT01新详情页_02 SLT01新详情页_05 SLT01新详情页_06 width=

Lock labeling requirements
First of all, durability, locks and signage should be able to withstand the environment being used; Secondly, it should be firm. Lock and signage should be strong enough to ensure that they cannot be removed without borrowing external forces. Also identifiable, the tag should be attached to the lock, indicating the name of the owner and the work being done; Finally, there should be uniqueness, each lock should only be equipped with a key, the key shall not be copied and others shall not be the master of the lock without authorization.

During the equipment debugging, by original isolated single sign, unlock and removal is not isolated in the list “isolation lift” column signature, just behind marked “lift for debugging,” date at the same time, the power equipment of electric transmission and electric debugging personnel by the project team is responsible for, so that we can facilitate in the process of debugging equipment, need test equipment operation, prevent because of frequent start-stop devices, frequently used in a work permit different isolation sheet. The electrical isolator will sign in the column of “Isolation Release” of the original isolation sheet only when the equipment is ready to be put into operation after commissioning. Due to the fact that different work types end the debugging on the same equipment successively, the electrical isolation lock and label should be hung back to the original position when the equipment is not put into operation after the debugging.
Is the person trained to perform the “locking” properly qualified
Whether the locks and locking auxiliary devices and signs meet the safety requirements and are properly managed, and whether the locks are used for personal use
Are there alternative security measures for debugging and other exceptions
Whether the communication in the actual implementation is sufficient, whether the measures are carried out in strict accordance with the procedures, and whether there are corresponding working procedures
Signs are divided into two kinds: general signs and local signs
LOTO master tag: A table representing a specific procedure for a locking device, identifying and describing the power source, locking/release point and method, validation method, and associated risks for the Lockout tagout. Also includes equipment tags
The layout diagram shows the location of the energy isolation points and the corresponding risks.
LOTO Local Signage: The approved local signage is posted directly on the equipment in a standard format, adjacent to the entrance or secured area. It defines the approved methods of energy control and the possible simple tasks to be performed within the danger zone.


Product detail pictures:

China Factory for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag SLT01 – Lockey detail pictures

China Factory for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag SLT01 – Lockey detail pictures

China Factory for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag SLT01 – Lockey detail pictures

China Factory for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag SLT01 – Lockey detail pictures


Related Product Guide:
Maintenance Safety –Lock Out & Tag Out(1)
The interpretation of national standard to LOTO

While using the "Client-Oriented" organization philosophy, a rigorous top quality command process, highly developed production devices and a potent R&D workforce, we normally provide high quality products, outstanding solutions and aggressive charges for China Factory for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag SLT01 – Lockey , The product will supply to all over the world, such as: Victoria, Azerbaijan, Jakarta, We strongly believe that technology and service is our base today and quality will create our reliable walls of future. Only we have better and better quality , could we achieve our customers and ourselves, too. Welcome customers all over the word to contact us for getting further business and reliable relationships. We are always here working for your demands whenever you need.
  • Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Louis from Uzbekistan - 2018.12.25 12:43
    Speaking of this cooperation with the Chinese manufacturer, I just want to say"well dodne", we are very satisfied.
    5 Stars By Nicole from Malta - 2017.11.20 15:58
    Write your message here and send it to us