Welcome to this website!
  • neye

Good Quality Cable Lockout - Economy Cable Lockout with Cable CB04 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We have quite a few great team customers very good at internet marketing, QC, and dealing with kinds of troublesome trouble while in the output approach for Loto In Electrical Safety , Mcb Lock Off Kit , Water Valve Lockout , We focus on creating own brand and in combination with many experienced term and first-class equipment . Our goods you worth have.
Good Quality Cable Lockout - Economy Cable Lockout with Cable CB04 – Lockey Detail:

Economy Cable Lockout with Cable CB04

a) Lock body: made from ABS, with insulation plastic coated steel cable.

b) Accepts up to 6 padlocks for multiple lockout application.

c) Cable length and color can be customized.

d) Includes high-visibility, re-usable, write-on safety labels. The length of labels can be customized.

Part No. Description
  CB04 Cable diameter 3.8mm, length 2 m

 width=  width=  width=  width=

Where do you use the Lockout Tagout program?
(1) High voltage operations (including operations near high voltage lines);
(2) Operation of live equipment;
(3) All work requiring temporary shutdown of the safety system;
(4) Entering a confined space (including operations in any area where there is a risk of hypoxia);
(5) work that may come into contact with harmful substances;
(6) Hot work (cutting, welding) in non-specified areas;
(7) work at high altitude and in deep pits;
(8) Demolition work;
(9) All excavations include work in the vicinity of underground pipes and underground cables;
(10) operations performed on equipment with radioactive sources.
A complete power source control process consists of four main parts:
1. Document the formulation of company policies and procedures
2. Energy source identification
3. Staff training and creating a safety culture environment
4. Equip employees with the right tools and equipment
Common dangerous energy sources
1. Electrical circuit switch
2. Mechanical fixed moving parts
3. Hydraulic release and discharge pressure
4. Pneumatic blocking gas transmission
5. Chemical drain pipes
6. Heat control temperature to normal temperature
7. Other…
Lockout/tagout6 steps
1. Prepare to shut down → shut down equipment → isolate energy source →Lockout tagout→ release remaining energy → confirm equipment isolation → repair or clean equipment


Product detail pictures:

Good Quality Cable Lockout - Economy Cable Lockout with Cable CB04 – Lockey detail pictures


Related Product Guide:
Implement post standard operation
Incorporate the transfer lockout system into your lockout plan

We're also concentrating on improving the things administration and QC program to ensure we could maintain terrific gain from the fiercely-competitive company for Good Quality Cable Lockout - Economy Cable Lockout with Cable CB04 – Lockey , The product will supply to all over the world, such as: America, Germany, Rwanda, The best and original quality for spare parts is a most important factor for transportation. We may stick on supplying original and good quality parts even a little profit earned. God will bless us to do kindness business forever.
  • The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Jean from Chile - 2018.02.08 16:45
    Good quality, reasonable prices, rich variety and perfect after-sales service, it's nice!
    5 Stars By Karen from Lyon - 2017.11.20 15:58
    Write your message here and send it to us