Welcome to this website!
  • neye

Good Quality Lockout Tagout Cabinet - 10-Lock Padlock Station kit LG02 – Lockey

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

The very rich projects management experiences and one to one service model make the high importance of business communication and our easy understanding of your expectations for Loto Solution , Loto Tag Out , Generator Circuit Breaker Lockout , Our intention should be to assist customers comprehend their goals. We have been creating terrific endeavours to obtain this win-win circumstance and sincerely welcome you to definitely join us!
Good Quality Lockout Tagout Cabinet - 10-Lock Padlock Station kit LG02 – Lockey Detail:

10-Lock Padlock Station  LG02

a) Made from engineering plastic PC.

b) It’s one piece design, with a cover to lock out.

c) Each hanger clip accommodates 2 padlocks or lockout hasps.

d) Lockable –Can use a combination padlock to limit access to authorized employee.

e) Overall size: 558x393x65mm.

Including:

1. Lockout station (LS02) 1PC;

2. Safety Padlock (P38S-RED) 10PCS;

3. Lockout hasp (SH01) 1PC;

4. Lockout hasp (SH02) 1PC;

5. Lockout tag (LT03)24PCS;

6. Some ribbons.

LG02_01 LG02_02

 width=

Considerations for Loto applications

Lockout Tagout safety procedures must be established, and operations and procedures for shutting down machinery and equipment and controlling potentially hazardous energy sources are required when performing repair or maintenance activities.

Employees must be trained in Lockout tagout prior to operation.

Outsourcing suppliers must also be aware of your company’s LOTO program.

The outsourcing supplier must perform Loto Lockout Tagout and let your employees know when they need to perform maintenance work on your equipment.

The Loto Lockout Tagout facility must be removed by the person who placed it.

When the Loto Lockout Tagout facility is used on different shifts, it is important to communicate and handover.

Regular inspection

Is the person trained to perform the “locking” properly qualified

Whether the locks and locking auxiliary devices and signs meet the safety requirements and are properly managed, and whether the locks are used for personal use

Are there alternative security measures for debugging and other exceptions

Whether the communication in the actual implementation is sufficient, whether the measures are carried out in strict accordance with the procedures, and whether there are corresponding working procedures.

 

The “Energy Isolation Information Board” shall be erected on site — the designated storage place for equipment locks, the centralized locking point for employees, the obtaining of relevant written program documents, the obtaining of standby hangtags, the visual isolation point chart, the information of authorized employees on duty and the information of the procedures used shall be publicized.

Contents above: 1. Name and phone number of centralized caller 2. Total number of locks in isolation group 3. Table 4 of isolation points Centralized Locking Box 5. Isolation System 6. Activity Plan 7. Dangerous Tag Removal Box 8.


Product detail pictures:

Good Quality Lockout Tagout Cabinet - 10-Lock Padlock Station kit LG02 – Lockey detail pictures

Good Quality Lockout Tagout Cabinet - 10-Lock Padlock Station kit LG02 – Lockey detail pictures


Related Product Guide:
Unlicensed live operation accident
Lockout Tagout work guide

We stay with the basic principle of "quality initially, services first, steady improvement and innovation to fulfill the customers" for your management and "zero defect, zero complaints" as the quality objective. To perfect our company, we give the goods while using the good high-quality at the reasonable selling price for Good Quality Lockout Tagout Cabinet - 10-Lock Padlock Station kit LG02 – Lockey , The product will supply to all over the world, such as: kazan, India, Mali, We pay high attention to customer service, and cherish every customer. We have maintained a strong reputation in the industry for many years. We are honest and work on building a long-term relationship with our customers.
  • This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
    5 Stars By Juliet from Bangladesh - 2018.06.05 13:10
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Meroy from Italy - 2017.07.07 13:00
    Write your message here and send it to us