Welcome to this website!
  • neye

Energy isolation in acetylene workshop

In order to ensure the operability of the energy isolation program, the implementation program consists of two stages: self-inspection and self-modification and consolidation and promotion. In the stage of self-inspection and self-reform, each party group shall improve the energy isolation ledger according to the implementation of responsibilities, isolation to the maximum extent, lock and key corresponding relationship, unified management, Lockout tagout method and shift transfer requirements, and conduct a comprehensive investigation on the implementation of energy isolation of facilities and equipment within the jurisdiction. In the consolidation and promotion stage, groups of all parties will conduct monthly effect evaluation according to the implementation situation, summarize and improve the energy isolation measures, further refine the energy isolation process, ensure that the energy isolation is effective, and lay a solid foundation for production safety. In the process of promoting the energy isolation work, the party members of acetylene workshop gave full play to the vanguard and exemplary role, investigated the energy isolation process and protective measures on the spot, and urged the operation personnel to carry out various operations strictly in accordance with the operating rules, so as to comprehensively prevent the occurrence of safety accidents.

Acetylene workshop party branch secretary Zhao Wei said: “the summary of all walks of life safety production accidents, the vast majority of them are caused by the accidental release of energy. Through the promotion of energy isolation work, further create workshop essence, normalization, benefit of a strong safety atmosphere. Acetylene workshop party branch to continue to play the role of battle fort, strict from fine to solid to build strong safety work, with responsibility to contain hidden dangers, with responsibility to support the safety of the ‘umbrella’, for the production equipment stable full of excellent operation to make a positive contribution.”

It is reported that since the energy isolation work has been promoted, the Party branch of The Chlor-alkali acetylene workshop of St. Xiong has fully refined the implementation of safety measures to achieve the essential safety control and implementation requirements. In the later stage, the party branch of acetylene workshop will continue to implement the requirements of The Party Committee on safety production, comprehensively improve the implementation standards of energy isolation, constantly summarize and improve the energy isolation plan, consolidate the foundation of safe production, and escort the safe production of enterprises.

Dingtalk_20211120094232


Post time: Nov-20-2021