- Final inspection of work site
A final inspection of the site should be carried out before re-using the equipment
The protective cover and sealing cover have been installed again
Isolation plate/blind plate has been removed
Fastening device has been restored
Scaffolding and tools have been removed
The flying material has been cleared
The operating valve is set correctly

Device restoration – Device startup

Follow the opening procedure carefully
Air must be removed before oil and gas is introduced to avoid explosive shout and black
If possible, inject a surge buffer between air and oil
Inspect seals, joints and flanges in the work area to prevent leakage.