In order to put an end to the unsafe factors of people, starting from the concept of essential safety and effectively preventing injuries caused by operators’ misoperations, copper Branch took power workshop as a pilot to carry out the implementation of energy isolation “Lockout tagout verification”.
Since March 26 power, head of the workshop organization workshop management and various working procedures, team leader, XiuLiZu personnel to carry out the energy isolation “Lockout tagout validation” measures for the administration of the detailed rules for the implementation and operation of training, workshop attaches great importance to this work, the team positive publicity, coordination and quickly issued “personal lock” and “public” lock, Full activation of energy isolation “Lockout Tagout validation”.
After a period of operation, the operation implementation of “Lockout Tagout verification” is standardized and good results are achieved in the workshop. Regarding the implementation of “Lockout Tagout verification”, Xiao Zhang, the operator of waste heat power station, said as follows: “Lockout Tagout verification operation, standardize the operation behavior, can effectively prevent the daily operation, maintenance and overhaul process, accidental electrical energy, chemical energy, equipment startup, resulting in personal injury, environmental damage or equipment damage.”
The workshop will strive to continue to revise and improve in the future work, promote the orderly development of safety, environmental protection and equipment work, and lay a solid foundation for the company’s comprehensive “Lockout Tagout verification” development.
Lockout Tagout validates LOTOTO workflow: Confirm equipment maintenance items → stop equipment → identify dangerous energy in the operation area → confirm power outage equipment, handle power outage operation ticket, use public lock to power switch Lockout tagout→ on-site verification, confirm equipment power outage, Lockout tagout with a public lock on the field equipment Lockout tagout→ the power supply public lock key and the field equipment public lock key into the lock box, the person in charge, operators, inspectors with personal lock on the lock box → implementation of the operation → maintenance completed, unlock the lock box, unlock the power switch and the field equipment → handle the power transmission operation ticket power transmission → boot, test.
Post time: Sep-19-2021