Welcome to this website!
  • neye

News

  • Cleaning plant equipment maintenance Lockout tagout operation guide

    Cleaning plant equipment maintenance Lockout tagout operation guide

    Cleaning plant equipment maintenance Lockout tagout operation guide 1. Scope of application of this instruction: routine maintenance, regular maintenance, overhaul, emergency repair and emergency rescue of coal washing plant equipment. 2. Equipment maintenance must be implemented Lockout tagout ...
    Read more
  • Lockout tagout Validation example

    Lockout tagout Validation example

    Lockout tagout Validation example — mechanical energy Close the valve; Test and check pipes, accumulators, cylinders for stored pressure, such as compressed air, gas, steam, water, liquid, etc.; Access ports in the equipment area where mechanical risks exist must have mechanical interlockin...
    Read more
  • Does the written listing and locking procedure contain all the required information?

    Does the written listing and locking procedure contain all the required information?

    Does the written listing and locking procedure contain all the required information? Verify that the Lockout tagout program contains all of the following requirements: a) Identify all potential hazardous energy sources, b) isolation, c) Zero energy state, d) Any service or maintenance activities ...
    Read more
  • Unauthorized access to the equipment

    Unauthorized access to the equipment

    Unauthorized access to the equipment In May 2003, the operator of the adsorption area of a factory, Mr. Guo, was operating the inner liner forming equipment. Without telling anyone, he drilled into the normal operation of the equipment from the bile connecting station to the back of the adsorptio...
    Read more
  • Power outage unlock program

    Power outage unlock program

    Power outage unlock program 1. After the inspection and maintenance operation is finished, the person in charge of inspection and maintenance shall inspect the maintenance site, confirm that all the personnel involved in the maintenance shall withdraw from the maintenance site, and the maintenanc...
    Read more
  • Hispanic Laborer Entangled in Auger at Pork Processing Plant

    Hispanic Laborer Entangled in Auger at Pork Processing Plant

    The maintenance foreman, another maintenance employee, and two laborers had been working on the remodeling project but at the time of the incident only one laborer was in the room with the victim. The co-worker ran outside the rendering room and yelled for help. He did not know the location for t...
    Read more
  • Lumber Industry Employee Killed When Lockout-Tagout Procedures Not Followed

    Lumber Industry Employee Killed When Lockout-Tagout Procedures Not Followed

    Lumber Industry Employee Killed When Lockout-Tagout Procedures Not Followed Problem A worker at a lumber company was killed while changing the blades on a piece of cutting equipment when a colleague mistakenly turned on the machine. Review A cutting machine was undergoing routine service for chan...
    Read more
  • Lockout/Tagout Accident Investigation

    Lockout/Tagout Accident Investigation

    Lockout/Tagout Accident Investigation Lockout/tagout was one of the first requirements OSHA mandated, starting in 1990. The electrical lockout/tagout regulation became effective in 1990, as well as part of Subpart S. Lockout/tagout training is conducted ad nauseam in every facility in the United ...
    Read more
  • What should be included in the periodic review of LOTO?

    What should be included in the periodic review of LOTO?

    What should Lockout tagout LOTO’s training include? Training shall be divided into authorized personnel training and affected personnel training. The authorized personnel training should include an introduction to the definition of Lockout tagout, a review of the company’s LOTO progra...
    Read more
  • Lockout tagout Work order requirements

    Lockout tagout Work order requirements

    1. Lock marking requirements First of all, it must be durable, the lock and the sign plate should be able to withstand the environment used; Secondly, to be firm, the lock and sign should be strong enough to ensure that without the use of external forces can not be removed; It should also be reco...
    Read more
  • LOTOTO asks

    LOTOTO asks

    Check regularly Check/audit the isolation location at least once a year and keep a written record for at least 3 years; The inspection/audit shall be performed by an authorized independent person, not the person performing the quarantine or the relevant person being inspected; The inspection/audi...
    Read more
  • Application of Loto scheme

    Application of Loto scheme

    Application of Loto scheme This standard applies to, but is not limited to, activities performed on a machine, equipment, process or circuit. Primary, secondary, stored or separate power sources are locked for service and maintenance. Service and maintenance Definition: repair, preventive mainten...
    Read more