  • Lockout tagout

    Lockout tagout

    Lockout tagout Lock and Lockout tag all hazardous energy sources, for example, physically insulating energy sources from the source with a hand-operated circuit breaker or line valve. Control or release residual energy Residual energy is usually not apparent, stored energy can cause injury by ca...
    Read more
  • Lockout Tagout LOTO program

    Lockout Tagout LOTO program

    Lockout Tagout LOTO program Understand equipment, identify hazardous energy and LOTO process Authorized personnel need to know all the energy set up for the equipment and know how to control the equipment. Detailed energy locking /Lockout tagout written procedures indicate what energy is involved...
    Read more
  • How to implement Lockout tag

    How to implement Lockout tag

    How to implement Lockout tag Locking involves professional locks, and the purchase cost is high. However, we can achieve 50% of the goal with Lockout tag at a very low cost. At least it’s better than starting with no management. So how do we implement Lockout tag? (1) Make the Lockout tag ...
    Read more
  • The essence of ensuring safety

    The essence of ensuring safety

    The essence of ensuring safety The essence of ensuring safety is to control energy, such as chemical energy, electrical energy, mechanical energy, gravitational potential energy and so on. We need to use various means, including PPE and safety protection facilities, so that these energy can not ...
    Read more
  • Lockout tagout system

    Lockout tagout system

    Lockout tagout system It refers to that when installing, maintaining, debugging, checking and cleaning the equipment, the switch (including power supply, air valve, water pump, blind plate, etc.) must be turned off, and obvious warning signs should be set up, or the switch should be locked to pr...
    Read more
  • EIP and non-lockout Tagout require non-loto?

    EIP and non-lockout Tagout require non-loto?

    EIP and non-lockout Tagout require non-loto? EIP:Energy Isolation Program Needs include: type of energy; Under the belt of energy; Equipment isolation point; Lockout Tagout step; Confirm the isolation Non-loto: Use the Lockout tag alone without locking The non-LOTO list should be checked when a s...
    Read more
  • Lockout Tagout requirements for personnel

    Lockout Tagout requirements for personnel

    Lockout Tagout requirements for personnel 1. The engineering maintenance personnel must strictly follow the Lockout Tagout (LOTO) procedure during each equipment maintenance, repair, transformation and debugging, because it is possible to have unexpected start-up and energy connection 2. After se...
    Read more
  • Application of LOTO scheme

    Application of LOTO scheme

    Application of LOTO scheme Primary, secondary, stored or separate energy sources are locked down for service and maintenance. Service and maintenance: Repair, preventive maintenance, improvement and installation activities of machinery, equipment, processes and wiring. These activities require th...
    Read more
  • Reasons for ignoring LOTO

    Reasons for ignoring LOTO

    Reasons for ignoring LOTO Environmental factors Mechanical design: LOTO may be difficult or impossible on some machines/equipment, especially older equipment. Energy isolation units are blocked or inaccessible. Human factor Lack of knowledge: Employees are not aware of the LOTO program. Overconfi...
    Read more
  • LOTO-Authorized personnel

    LOTO-Authorized personnel

    Authorized personnel Personnel appropriately trained and authorized to perform hazardous energy control (Lockout/tagout). Authorized personnel are those employees who have a part of their body that requires access to the hazardous energy zone in order to complete their work/task. It is the duty o...
    Read more
  • LOTO- Security disclosure

    LOTO- Security disclosure

    LOTO- Security disclosure The entrusting party shall make written safety disclosure to the maintenance party When maintenance projects are concentrated, hazard identification, measure formulation and plan preparation can be carried out in advance according to the actual situation on site. However...
    Read more
  • LOTO danger foresee

    LOTO danger foresee

    LOTO danger foresee 1. Further strengthen the identification of important risk points before maintenance operation, mainly including: energy sources, toxic and harmful media, personnel station location, surrounding environment, especially the impact of slow mobile equipment, etc., and solidify in...
    Read more