Welcome to this website!
  • neye

News

  • Loto – Memorize the Ten Principles

    Remember the ten principles Two preparation tasks: Personal protective equipment and site isolation 5 items that can be observed in the machine room: Lifting operations, stored mechanical energy, locking and latching, live operations – troubleshooting and short wiring Three things can be ob...
    Read more
  • Lockout Tagout (LOTO) training board

    【 Lockey Products and Services 】 Lockout Tagout (LOTO) training board First, product functions Training board through the chemical production process of liquid, gas, steam and chemicals in the simulation of various valves, as well as the simulation of various switches and buttons in the circui...
    Read more
  • Bottling Plant Loto Incident

    Bottling Plant Loto Incident The accident happened at a bottling plant in Florida. The employee’s first day on the job turned out to be his last. Here is a palletizer, a machine that packs rum and stacks it on pallets. The man in the picture above is operating the machine. He needs to cle...
    Read more
  • Photovoltaic power station LOTO

    Photovoltaic power station LOTO Safety begins with adequate planning and preparation. To prevent accidents or injuries, an effective safety policy must be in place and plant personnel and contractors must be familiar with and strictly follow the following safety procedures. Important safety requi...
    Read more
  • Loto-lock out Tag out security check

    Loto-lock out Tag out security check

    Loto-lock out Tag out security check Execution steps of locking program: Inform all may be affected employees, clearly know the source of energy, the most important step is to know about the potential energy of the machine, observe all the connection machine hole \ tube, etc., do not believe that...
    Read more
  • Considerations for the loto-lockout Tag

    Considerations for the loto-lockout Tag

    Locking to suspend unused devices, or when the device is not in use, the device must be Lockout and Tagout. Personal locking is the method advocated in locking programs. When handling machines or processes, employees should add their own locks to the equipment. The locks must be used with differe...
    Read more
  • LOTO- Heat treatment event

    LOTO- Heat treatment event

    In 2020, there was a heat treatment accident in the United States, which resulted in the death of two employees. The reason was that safety procedures Lock Out Tag Out (LOTO) and Restricted Space Code were not followed. This accident tells us that heat treatment is a very dangerous industry, heat...
    Read more
  • Safety work- LOTO

    Safety work- LOTO Strict production site operation management From now to July 15, the number and frequency of high-risk operations on the production site will be strictly controlled in accordance with the “two special and two double” management. All operations on the production site...
    Read more
  • Safety Production Training (2)

    Safety helmet is not worn at the operation site Violation: not wearing safety helmet in hot weather; Wear safety helmet without hat strap; Take off the safety helmet in the lucky heart; Strike damage everywhere, do not take any chances, you may not wear a helmet that moment, the accident happened...
    Read more
  • Safety Production Training (1)

    Safety training Do not fasten the safety belt in the height operation Important reminder: falling from high places is the number one killer! Elevation operation refers to the operation carried out at the height above 2m (including 2m) of the datum level of the fall height where there is a possib...
    Read more
  • Loto implements Q&A (2)

    Are all authorized and influential personnel trained in Lockout Tagout? By interviewing authorized personnel, reviewing authorized personnel list, defining relevant influential personnel, verifying retrospective training matrix, annual training plan (new personnel and refresher training), trainin...
    Read more
  • Loto implements Q&A (3)

    Is the line operations supervisor or team leader involved in the implementation of the Lockout Tagout process? Verify necessary records by interviewing frontline employees, asking their supervisor or team leader to assess the work done in the execution of the Lockout Tagout process Supervisors we...
    Read more