Welcome to this website!
  • neye

Preheater hidden trouble detection criteria

Preheater hidden trouble detection criteria

1. Preheater (including calciner) running

Preheater platform, components and guardrail should be complete and firm.

Air gun and other pneumatic components, pressure vessels work normally, the flap valve should have reliable locking device.

Preheater manhole door and cleaning hole cover should be locked and sealed well.

Reliable heat insulation or protection facilities and warning labels should be set up around high-temperature equipment.

An escape channel should be set up on the clogging operation platform.

It is strictly prohibited to pile inflammable and explosive materials on the platform around the preheater.

Emergency facilities such as showers and eye washers should be installed in the vicinity of the kiln tail preheater system to clear the skin and block the operation site.

The illumination of the operation site meets the requirements.

Put up the on-site emergency disposal plan and equip the nearest emergency supplies.

Set up safety warning signs such as “Beware of high surface temperature” and “No throwing from high altitude”. Set up high risk warning boards.

2. Preheater plugging operation

Before the plugging operation, the application for dangerous operation must be handled, the plugging plan and emergency plan of preheater must be formulated, and the site shall be supervised by special personnel.

Operators should wear fireproof and heat insulation special labor protection supplies, check the corresponding operating tools, to ensure safe use.

Confirm with the central control, maintain the negative pressure of the system, perform energy isolation, close the air gun inlet valve and lockout, empty the air gun internal air source, hang “no operation” warning sign.

Dingtalk_20210911140114
Isolation facilities and warning marks shall be set at the entrance of grate cooler and inclined zipper pit to prohibit personnel from working.

During the operation must follow the principle from bottom to top, it is forbidden to porous at the same time cleaning; When using high pressure gas cleaning, it is necessary to ensure that the cleaning pipe penetrates through the material layer to prevent material spraying. Special personnel control the high pressure gas valve.

The plugging operation personnel should stand in the upper air outlet, should be side to the cleaning hole, to prevent the material collapse, spray caused by burns; When using high-pressure water gun to clear the blockage, the relevant safety operation procedures must be strictly followed, and the escape route should be clear and unblocked.

In the process of cleaning the site each layer platform and preheater to set up around the warning range, to prevent raw powder spew wounding, raw powder spew may touch the cable and equipment to take protective measures.

When dealing with the jam of decomposer, the field personnel need to cut off the power supply, such as the use of air cannon, must lock the cover of the observation door and plugging.

The use of high-pressure water gun shall strictly follow the corresponding safety operation rules or operating instructions to prevent injury accidents.

3. Enter the preheater for maintenance

Application for dangerous operations must be handled, on-site special supervision, strictly implement the provisions of “ventilation first, then detection, then operation”.

Operators should wear labor protection articles, check the corresponding operating tools, to ensure safe use.

Confirm with the central control, maintain the negative pressure of the system, perform energy isolation, close the air gun inlet valve and lock, empty the air gun internal air source, hang “no operation” warning sign; Lock all levels of flap valves.

Maintenance operations should have the corresponding safety plan, and strictly implement; The scaffold must be set up in accordance with the specifications. Before operation, clean up the accumulated material of each pipeline, and check whether the accumulated material is clean and whether pouring materials and firebricks are loose before operation.

Set up double safety protection canopy.

Use 12V safe voltage lighting.


Post time: Sep-11-2021